Targeted dismantling of structural components while protecting the elements, building envelope, and systems that are not designated for demolition.

03 / Existing Structures

Selective Demolition

Targeted dismantling of structural components while protecting the elements, building envelope, and systems that are not designated for demolition.

FocusDefined Partial Dismantling
ControlCut Before Lifting
PreservationProtecting the Existing Structure
01 What Drives the Execution

Precision BeginsBefore the Cut.

Remove Only What Is Required

Demolition within an existing structure differs from full demolition. The boundaries of each element must be identified, adjacent areas protected, and any uncontrolled transfer of loads, vibration, or debris prevented.

Phased Dismantling

The method combines sawing, drilling, localized breaking, supports, and rigging in accordance with the execution plan. The element is divided into manageable sections that can be controlled, lifted, or removed without damaging the envelope that remains.

02 Work Sequence

Four Stages.One Controlled Process.

  1. 01
    Boundary Mapping

    Identify the element to be dismantled, the areas to be preserved, and nearby systems.

  2. 02
    Support and Rigging

    Define supports, lifting points, and segment weights before cutting.

  3. 03
    Sequenced Cutting

    Saw and drill in an order that prevents uncontrolled release of the element.

  4. 04
    Clean Removal

    Remove the segments, clear the area, and inspect the remaining structure.

03 Adapted to Site Conditions