Crane and forklift lifting and removing concrete segments

05 / Lifting & Removal

Concrete Segment Lifting & Removal

Cutting is only one part of the operation. Every segment requires suitable rigging points, the correct lifting equipment, and a removal route matched to site conditions.

PlanningWeight, Rigging, and Removal Route
EquipmentCrane, Forklift, and Lifting Chains
SequenceCut, Lift, and Remove the Segment
01 What Drives the Execution

Plan the ExitBefore the Cut.

Every Segment Needs a Way Out

Before work begins, we assess the segment's weight, lifting points, access constraints, and the space available for lifting-equipment movement. This planning also determines the cut size and sequence of operations.

Adapted to Site Conditions

A crane is suited to vertical lifting and heavy segments, while a forklift can provide an effective solution when a segment must be lifted and transported through an accessible work area. The equipment is selected according to the actual lifting and removal conditions.

02 Work Sequence

Four Stages.Planned Removal.

  1. 01
    Survey and Access

    Assess weight, dimensions, anchor points, and the route out of the work area.

  2. 02
    Equipment Selection

    Match the crane, forklift, chains, and rigging gear to site conditions.

  3. 03
    Cutting and Rigging

    Cut in the planned sequence and secure the segment before final separation.

  4. 04
    Lifting and Removal

    Lift the segment, move it along the designated route, and prepare the area for the next stage of work.

03 Adapted to Site Conditions